Building Information Modelling (BIM)

Building Information Modeling (BIM) is a process that begins with the creation of an intelligent 3D model and enables document management, coordination and simulation during the entire lifecycle of a project (plan, design, build, operation and maintenance). We provide various stages of BIM services, Level Of Development (LOD), ranging from LOD 100, LOD 200, LOD 300, LOD 350, LOD 400 and LOD 500 as required from the client and at different cost.

LOD 100

Concept Design The building 3D model is developed to represent the information on basic level. Thereby, only conceptual model creation is possible in this stage. Parameters like area, height, volume, location and orientation are defined

LOD 200

Schematic Design General model where elements are modeled with approximate quantities, size, shape, location and orientation. We can also attach non- geometric information to the model elements

LOD 300

Detailed Design Accurate modeling and shop drawings where elements are defined with specific assemblies, precise quantity, size, shape, location and orientation. Clash report is then generated for any errors and to be rectified immediately before construction.

LOD 350

Construction Documentation It includes model detail and element that represent how building elements interface with various systems and other building elements with graphics and written definitions

LOD 400

Fabrication & Assembly Model elements are modeled as specific assemblies, with complete fabrication, assembly, and detailing information in addition to precise quantity, size, shape, location and orientation. Non-geometric information to the model elements can also be attached

LOD 500

As-Built Elements are modeled as constructed assemblies for Maintenance and operations, especially for facility management. In addition to actual and accurate in size, shape, location, quantity, and orientation, non-geometric information is attached to modeled elements

Advantages of BIM

  • Minimize errors during design stage, reduces construction phases amendment cost.
  • Cut down time delayed due to pending confirmation of changes of design at construction stage from client or consultants.
  • Increase accuracy on calculation of building cost & quantity.
  • Reduce risk through construction simulation.
  • Multiple building services collaboration.
  • Site progress tracking and management.

BIM not only allows design and construction teams to work more efficiently, but it allows them to capture the data they create during the process to benefit operations and maintenance activities.

  • mix-development-rawang-5
  • Description: Mix Development in Country Homes, Rawang
  • mix-development-rawang-9
  • Description: Mix Development in Country Homes, Rawang
  • mix-development-rawang-10
  • Description: Mix Development in Country Homes, Rawang
  • mix-development-rawang-11
  • Description: Mix Development in Country Homes, Rawang


View Our Projects Gallery